Safety Audits Of WMATA Metrorail

WMSC Triennial Audit Cycle 2

  • 2024
    • Audit of Roadway Worker Protection (RWP) Program – Download PDF
    • Audit of Revenue Vehicles (Railcar) Program – Download PDF
    • Audit of Power Systems – Download PDF
    • Audit of Automatic Train Control (ATC) and Signals Program – Download PDF
  • 2023
  • 2022

WMSC Triennial Audit Cycle 1 (Reports Issued 2020-2022)

  • WMSC Triennial Safety Audit of WMATA Metrorail, Three-Year Audit Report Cumulative VolumeDownload PDF (note: very large file size, individual reports available below)
    • Constituent reports:
      • 2022
        • Audit of Communications Systems – Download PDF
        • Audit of Station Maintenance, Elevators and Escalators – Download PDF
        • Audit of Rail Operations – Download PDF
        • Audit of Emergency Management and Fire and Life Safety Programs – Download PDF
      • 2021
        • Audit of High Voltage and Traction Power Programs – Download PDF
        • Audit of Revenue Vehicle (Railcar) Programs – Download PDF
        • Audit of Fitness for Duty Programs – Download PDF
        • Audit of Automatic Train Control (ATC), Signals and Signal Machines Planning, Inspection, Maintenance and Training – Download PDF
        • Audit of Roadway Maintenance Machine (RMM) Inspection, Maintenance and Training – Download PDF
        • Audit of Elevated Structures Inspection, Maintenance and Repair – Download PDF
      • 2020
        • Audit of the Department of Rail Transportation: Rail Operations Control Center (ROCC) – Download PDF
        • Audit of Roadway Worker Protection (RWP) and Training – Download PDF
        • Audit of Track Maintenance and Training – Download PDF

ACCESSIBILITY             DBE               NON-DISCRIMINATION