REPORTS

2023

  • 2023-01-09 – Roadway Worker Protection Training Observation – Download PDF
  • 2023-01-10 – Roadway Worker Protection Training Observation – Download PDF
  • 2023-01-23 – Roadway Worker Protection Certification Compliance Reinspection – Download PDF
  • 2023-01-23 – Roadway Worker Protection Certification Compliance Reinspection (2) – Download PDF
  • 2023-01-27 – New Carrollton Rail Yard Compliance Inspection – Download PDF
  • 2023-01-27 – New Carrollton Rail Yard Train Test and Inspection Observation – Download PDF
  • 2023-01-30 – Brookland-Catholic University Station Inspection – Download PDF
  • 2023-02-03 – Records Review- Download PDF
  • 2023-02-18 – Ronald Reagan National Airport Station Crane Operations Safety Inspection – Download PDF
  • 2023-02-28 – Wheaton Plaza Station Full Scale Emergency Exercise – Download PDF
  • 2023-03-08 – Potomac Yard Station Emergency Trip Station Push Buttons Operation Inspection – Download PDF
  • 2023-03-17 – Shady Grove Yard Track Inspection – Download PDF
  • 2023-04-03 – Greenbelt Rail Yard Track and Structure Observation – Download PDF
  • 2023-04-04 – Dunn Loring Observation – Download PDF
  • 2023-04-24 – ATO Testing Observation – Download PDF
  • 2023-04-28 – ATO Training Observation – Download PDF
  • 2023-05-01 – Roadway Worker Protection Instructor Training Observation – Download PDF
  • 2023-05-11 – Roadway Worker Protection Training Observation – Download PDF
  • 2023-06-23 – Roadway Worker Protection Training Observation – Download PDF
  • 2023-06-23 – Roadway Worker Protection Training Observation – Download PDF
  • 2023-06-30 – ROCC Inspection – Download PDF
  • 2023-07-13 – Deanwood Station ETS Inspection – Download PDF
  • 2023-07-14 – ROCC Inspection – Download PDF
  • 2023-07-17 – Farragut North Station FLS Inspection Record Review – Download PDF
  • 2023-07-19 – Brentwood MRO Wheel Exceedance Teardown Observation – Download PDF
  • 2023-07-19 – Woodley Park Station FLS Inspection Record Review – Download PDF
  • 2023-07-20 – Judiciary Square Station FLS Inspection Record Review – Download PDF
  • 2023-08-20 – Alexandria S&I Shop Compliance Inspection – Download PDF
  • 2023-08-21 – Brentwood S&I Shop Wheelset Assembly Process Compliance Inspection – Download PDF
  • 2023-08-23 – Rail Transportation Certification Document Review – Download PDF
  • 2023-08-23 – Dulles S&I Shop Inspection and Meeting Observation – Download PDF
  • 2023-08-24 – Train Availability for Training Inspection – Download PDF
  • 2023-08-28 – Shady Grove S&I Shop Compliance Inspection – Download PDF
  • 2023-08-30 – Roadway Worker Protectino Training Inspection – Download PDF
  • 2023-08-30 – Roadway Worker Protection Training Inspection (2) – Download PDF
  • 2023-08-30 – Roadway Worker Protection Training Inspection (3) – Download PDF
  • 2023-08-30 – Roadway Worker Protection Training Inspection (4) – Download PDF
  • 2023-08-30 – Roadway Worker Protection CBT Inspection – Download PDF
  • 2023-08-30 – New Train Operation Roadway Worker Protection Training Inspection – Download PDF
  • 2023-09-04 – West Falls Church S&I Shop Compliance Inspection – Download PDF
  • 2023-09-04 – New Carrollton S&I Shop Compliance Inspection – Download PDF
  • 2023-09-11 – New Carrollton S&I Shop Compliance Inspection – Download PDF
  • 2023-09-15 – Branch Ave Rail Yard​ Fall Protection and FLS Inspection – Download PDF
  • 2023-09-15 – Roadway Worker Protection Training Inspection – Download PDF
  • 2023-09-16 – Branch Avenue S&I Shop Compliance Inspection – Download PDF
  • 2023-09-17 – Capitol South Station​ Full Scale Emergency Exercise Observation – Download PDF
  • 2023-09-17 – Capitol South Station​ Full Scale Emergency Exercise Observation (2) – Download PDF
  • 2023-09-17 – Capitol South Station​ Full Scale Emergency Exercise Observation (3) – Download PDF
  • 2023-09-18 – Rail Transportation Certification Document Review – Download PDF
  • 2023-09-20 – Rail Transportation Certification Document Review – Download PDF
  • 2023-09-25 – ROCC Inspection – Download PDF
  • 2023-09-27 – Roadway Worker Protection Training Document Review – Download PDF
  • 2023-09-27 – Morgan Boulevard Station CAP Verification Inspection – Download PDF
  • 2023-09-28 – Red Line Advanced Mobile Flagger Protection Inspection – Download PDF
  • 2023-09-29 – Roadway Worker Protection Training Inspection – Download PDF
  • 2023-09-29 – Rail Transportation Certification Document Review – Download PDF

2022

  • 2022-01-22 – Records Review – Download PDF
  • 2022-01-22 – Records Review (2) – Download PDF
  • 2022-01-22 – Records Review (3) – Download PDF
  • 2022-01-31 – Winter Storm EOC – Download PDF
  • 2022-02-02 – Power Desk Exercise – Download PDF
  • 2022-02-01 – Communications and radio usage – Download PDF
  • 2022-02-02 – Rail Safety Standards Committee Meeting – Download PDF
  • 2022-02-02 – Roadway Worker Protection Compliance Inspection – Download PDF
  • 2022-02-02 – Power Desk Exercise (2) – Download PDF
  • 2022-02-03 – Shady Grove Yard Service & Inspection Shop Inspection – Download PDF
  • 2022-02-02 – Rhode Island Ave ATCM Field Office Inspection – Download PDF
  • 2022-02-02 – New Carrollton Service & Inspection Shop and Yard Inspection – Download PDF
  • 2022-02-08 – Rhode Island Ave ATCM Train Control Room Inspection – Download PDF
  • 2022-02-08 – Rhode Island Ave ATCM Field Office Inspection – Download PDF
  • 2022-02-10 – Train Operator Riding Compliance Inspection – Download PDF
  • 2022-02-10 – Glenmont ATCM Field Office Inspection – Download PDF
  • 2022-02-10 – Archives Station Track Familiarization Walk for First Responders – Download PDF
  • 2022-02-11 – Power Desk and ROCC Inspection – Download PDF
  • 2022-02-14 – Communications and radio usage – Download PDF
  • 2022-02-15 – Archives Station Track Familiarization Walk for First Responders – Download PDF
  • 2022-02-16 – Prince George’s Plaza Switch Indication Locking Testing and PMI – Download PDF
  • 2022-02-18 – Alexandria Yard Service & Inspection Shop Inspection – Download PDF
  • 2022-02-23 – West Falls Church Yard Service & Inspection Shop Inspection – Download PDF
  • 2022-02-24 – Medical Center Station – Download PDF
  • 2022-02-24 – Train Operator Riding Compliance Inspection – Download PDF
  • 2022-02-28 – Fire & Life Safety Inspection – Download PDF
  • 2022-03-04 – Brentwood Yard Service & Inspection Shop Inspection – Download PDF
  • 2022-03-07 – ROCC Inspection – Download PDF
  • 2022-03-09 – ROCC Inspection – Download PDF
  • 2022-03-09 – Silver Line Maintenance Exercise – Download PDF
  • 2022-03-15 – Communications and radio usage – Download PDF
  • 2022-03-16 – Automated Wayside Inspection System Testing – Download PDF
  • 2022-03-17 – Communications and radio usage – Download PDF
  • 2022-03-17 – Train Operator Riding Compliance Inspection – Download PDF
  • 2022-03-17 – Train Operator Riding Compliance Inspection (2) – Download PDF
  • 2022-03-24 – Communications and radio usage – Download PDF
  • 2022-03-24 – Train Operator Riding Compliance Inspection – Download PDF
  • 2022-03-25 – Archives Station Track Familiarization Walk for First Responders – Download PDF
  • 2022-03-29 – Friendship Heights Train Control Room Inspection – Download PDF
  • 2022-03-31– Intrusion Detection Warning System – Download PDF
  • 2022-03-31– Friendship Heights Train Control Room Inspection – Download PDF
  • 2022-04-05– ATCM Apprentice Program Observation – Download PDF
  • 2022-04-07– Friendship Heights Train Control Room Inspection – Download PDF
  • 2022-04-08 – Automated Wayside Inspection System – Download PDF
  • 2022-04-13 – Maintenance and Service Instruction Procedure Observation – Download PDF
  • 2022-04-18 – Eisenhower Avenue Site Survey Inspection – Download PDF
  • 2022-04-18 – Friendship Heights Train Control Room Reinspection – Download PDF
  • 2022-04-18 – Ultrasonic Testing Observation – Download PDF
  • 2022-04-19 – West Falls Church Yard Inspection – Download PDF
  • 2022-04-19 – West Falls Church Yard Inspection (2)– Download PDF
  • 2022-04-20 – West Hyattsville Fire and Life Safety Inspection – Download PDF
  • 2022-04-25 – ROCC Inspection – Download PDF
  • 2022-04-25 – ROCC Observation – Download PDF
  • 2022-04-28 – Farragut West Inspection – Download PDF
  • 2022-05-02 – Automated Wayside Inspection System Certification Observation – Download PDF
  • 2022-05-03 – Foggy Bottom Fire & Life Safety Inspection – Download PDF
  • 2022-05-21 – Automated Wayside Inspection System Installation Observation – Download PDF
  • 2022-05-31 – Onboard 7000 Railcar Test Train Observation – Download PDF
  • 2022-06-01 – Rules Committee Meeting – Download PDF
  • 2022-06-06 – Alexandria Rail Yard Inspection – Download PDF
  • 2022-06-09 – Alexandria Rail Yard Reinspection – Download PDF
  • 2022-06-13 – West Falls Church Yard Inspection – Download PDF
  • 2022-06-17 – Onboard 7000 Railcar Test Train Observation – Download PDF
  • 2022-06-17 – ROCC Inspection – Download PDF
  • 2022-06-22 – Thermite Welding Observation – Download PDF
  • 2022-06-29 – ROCC Inspection – Download PDF
  • 2022-07-04 – Independence Day EOC – Download PDF
  • 2022-07-13 – 7000 Series Railcar Inspection Observation – Download PDF
  • 2022-07-13 – Branch Avenue Station Inspection – Download PDF
  • 2022-07-28 – Branch Avenue Station Reinspection – Download PDF
  • 2022-09-15 – Records Review – Download PDF
  • 2022-09-15 – Roadway Worker Protection Safety Standdown Observation – Download PDF
  • 2022-09-15 – Silver Line Phase II Familiarization Training Observation – Download PDF
  • 2022-10-13 – Silver Line Phase II Safety Inspection – Download PDF
  • 2022-10-13 – ROCC Inspection – Download PDF
  • 2022-10-14 – Silver Line Phase II Stations Inspection – Download PDF
  • 2022-10-14 – Silver Line Phase II Familiarization​ Training Inspection – Download PDF
  • 2022-10-14 – Roadway Worker Protection Safety Standdown Observation – Download PDF
  • 2022-10-14 – New Carrollton Service & Inspection Shop and Yard Inspection – Download PDF
  • 2022-10-18 – Silver Line Phase II Safety Reinspection – Download PDF

2021

  • 2021-01-04 – Deanwood Station Complete Inspection – Download PDF
  • 2021-01-07 – T77-Building A Complete Reinspection – Download PDF
  • 2021-01-11 – Twinbrook Parking Garage – Download PDF
  • 2021-01-11 – Branch Ave Generator – Download PDF
  • 2021-01-16 – Tysons Corner Station Complete Inspection – Download PDF
  • 2021-01-17 – Brookland Tie-Breaker – Download PDF
  • 2021-01-22 – New Carrollton and West Falls Church Yard Compliance – Download PDF
  • 2021-01-22 – K Street Tie-Breaker – Download PDF
  • 2021-01-24 – Union Station Traction Power Substation – Download PDF
  • 2021-01-25 – Electronic Device Policy Compliance – Download PDF
  • 2021-01-25 – Mt. Vernon Square Traction Power Substation – Download PDF
  • 2021-01-26 – MTPD District 1 Complete Facility Inspection – Download PDF
  • 2021-01-28 – Greenbelt Service & Inspection and Yard – Download PDF
  • 2021-02-01 – Glenmont Parking Garage – Download PDF
  • 2021-02-01 – Glenmont Generator PMI – Download PDF
  • 2021-02-01 – Naylor Road Station Complete Inspection – Download PDF
  • 2021-02-02 – Navy Yard Station Complete Inspection – Download PDF
  • 2021-02-03 – Rules Committee – Download PDF
  • 2021-02-04 – Shaw-Howard University Station Complete Inspection – Download PDF
  • 2021-02-04 – New Carrollton Yard Storage – Download PDF
  • 2021-02-04 – Greenbelt Yard Storage – Download PDF
  • 2021-02-07 – Greenbelt Yard Storage – Download PDF
  • 2021-02-08 – White Flint Generator – Download PDF
  • 2021-02-09 – McPherson Square Station Reinspection – Download PDF
  • 2021-02-10 – Compliance Checks – Download PDF
  • 2021-02-10 – Compliance Checks – Download PDF
  • 2021-02-10 – Compliance Checks – Download PDF
  • 2021-02-10 – Compliance Checks – Download PDF
  • 2021-02-10 – Shady Grove Traction Power – Download PDF
  • 2021-02-12 – Electronic Device Policy Compliance – Download PDF
  • 2021-02-16 – Electronic Device Policy Compliance – Download PDF
  • 2021-02-17 – Rules Committee – Download PDF
  • 2021-02-17 – Fort Totten Traction Power – Download PDF
  • 2021-02-17 – Fort Totten Traction Power – Download PDF
  • 2021-02-18 – Smithsonian Station Complete Inspection – Download PDF
  • 2021-02-24 – ATC PMI Compliance – Download PDF
  • 2021-02-24 – ATC Trend Analysis – Download PDF
  • 2021-03-02 – Navy Yard Station Reinspection – Download PDF
  • 2021-03-02 – Rules Commitee – Download PDF
  • 2021-03-04 – Greenbelt Service & Inspection and Yard – Download PDF
  • 2021-03-05 – Shaw-Howard University Station Reinspection – Download PDF
  • 2021-03-05 – Plant Maintenance – Download PDF
  • 2021-03-05 – Electronic Device Policy Compliance – Download PDF
  • 2021-03-08 – Brentwood Yard – Download PDF
  • 2021-03-08 – Brentwood Yard – Download PDF
  • 2021-03-12 – Franconia-Springfield Complete Inspection – Download PDF
  • 2021-03-15 – Maintenance of Way Engineering – Download PDF
  • 2021-03-16 – Emergency Preparedness Exercise – Download PDF
  • 2021-03-17 – Rules Committee – Download PDF
  • 2021-03-18 – Track and Structures – Download PDF
  • 2021-03-18 – Automatic Train Control – Download PDF
  • 2021-03-18 – Shady Grove Service & Inspection – Download PDF
  • 2021-03-19 – Greenbelt Yard Radio Inspection – Download PDF
  • 2021-03-22 – Greenbelt Yard Radio Inspection – Download PDF
  • 2021-03-24 – Brentwood Yard Track Circuit – Download PDF
  • 2021-03-25 – Red Line Mitigation Verification – Download PDF
  • 2021-03-26 – West Falls Church Yard – Download PDF
  • 2021-03-26 – West Falls Church Yard (2) – Download PDF
  • 2021-04-07 – Rules Commitee – Download PDF
  • 2021-04-08 – Shady Grove Rail Yard Complete Inspection – Download PDF
  • 2021-04-12 – FLS Facility Inspection Deficiency Meeting – Download PDF
  • 2021-04-21 – Rules Committee – Download PDF
  • 2021-04-23 – Alexandria Yard Storage – Download PDF
  • 2021-04-23 – Reverse Stretch Training – Download PDF
  • 2021-05-03 – Southern Ave Battery Bank PMI – Download PDF
  • 2021-05-04 – ATC Inspection – Download PDF
  • 2021-05-04 – Glenmont Yard Fire & Life Safety Inspection – Download PDF
  • 2021-05-04 – Glenmont Yard Radio Inspection – Download PDF
  • 2021-05-04 – Glenmont Yard Track Inspection – Download PDF
  • 2021-05-05 – Greenbelt Generator – Download PDF
  • 2021-05-05 – Rules Committee – Download PDF
  • 2021-05-10 – Benning Road Station Complete Inspection – Download PDF
  • 2021-05-11 – New Carrollton Generator – Download PDF
  • 2021-05-12 – Branch Avenue Generator – Download PDF
  • 2021-05-17 – Branch Avenue Full Scale Emergency Exercise – Download PDF
  • 2021-05-17 – Branch Avenue Full Scale Emergency Exercise (2) – Download PDF
  • 2021-05-17 – Branch Avenue ETO Inspection – Download PDF
  • 2021-05-17 – Minnesota Avenue Generator – Download PDF
  • 2021-05-19 – Rules Committee – Download PDF
  • 2021-05-20 – Roadway Worker Protection Inspection – Download PDF
  • 2021-05-20 – Ventilation Playbook – Download PDF
  • 2021-05-24 – Corrective Maintenance – Download PDF
  • 2021-05-25 – Rosslyn Generator – Download PDF
  • 2021-06-10 – Congress Heights Station Reinspection – Download PDF
  • 2021-06-10 – Greensboro Station Reinspection – Download PDF
  • 2021-06-11 – Addison Road Station Inspection – Download PDF
  • 2021-06-15 – Arlington Cemetery Station Inspection – Download PDF
  • 2021-06-15 – ATC Safety Meeting – Download PDF
  • 2021-06-17 – Alexandria Yard Compliance – Download PDF
  • 2021-06-21 – Alexandria Yard Reinspection – Download PDF
  • 2021-06-21 – Greenbelt Yard – Download PDF
  • 2021-06-21 – Suitland Station Inspection – Download PDF
  • 2021-06-23 – Training Records Review – Download PDF
  • 2021-06-28 – Greenbelt Yard Inspection – Download PDF
  • 2021-07-01 – Standpipe Status Review – Download PDF
  • 2021-07-04 – Independence Day EOC – Download PDF
  • 2021-07-07 – Communications and radio usage – Download PDF
  • 2021-07-07 – Communications and radio usage (2) – Download PDF
  • 2021-07-07 – Communications and radio usage (3) – Download PDF
  • 2021-07-07 – Communications and radio usage (4) – Download PDF
  • 2021-07-07 – Federal Triangle Station Communications and radio usage – Download PDF
  • 2021-07-12 – Greenbelt MRO Shop Inspection – Download PDF
  • 2021-07-20 – Alexandria Yard ATC – Download PDF
  • 2021-07-20 – Twinbrook Station Complete Inspection – Download PDF
  • 2021-07-21 – Alexandria Yard Inspection – Download PDF
  • 2021-08-03 – Fire & Life Safety Inspection – Download PDF
  • 2021-08-10 – Farragut North Station Elevator-Escalator – Download PDF
  • 2021-08-12 – Braddock Road Station Fire & Life Safety Inspection – Download PDF
  • 2021-08-12 – Dupont Circle Station Elevator-Escalator – Download PDF
  • 2021-08-12 – Medical Center Station Complete Inspection – Download PDF
  • 2021-08-13 – Telegraph Road ATC – Download PDF
  • 2021-08-16 – Reagan National Airport Station Elevator-Escalator – Download PDF
  • 2021-08-18 – ROCC Summary Log Review – Download PDF
  • 2021-08-22 – ROCC Inspection – Download PDF
  • 2021-08-23 – CCTV Inspection – Download PDF
  • 2021-08-23 – ETS Inspection – Download PDF
  • 2021-08-24 – Roadway Worker Protection Compliance – Download PDF
  • 2021-08-27 – Greenbelt Station ATC – Download PDF
  • 2021-08-29 – Greenbelt Yard CTEM Shop Inspection – Download PDF
  • 2021-08-30 – D&G Junction ATC – Download PDF
  • 2021-09-02 – Clarendon Station Switch Inspection – Download PDF
  • 2021-09-03 – Foggy Bottom Fire & Life Safety Inspection – Download PDF
  • 2021-09-03 – Tropical Storm Ida EOC – Download PDF
  • 2021-09-07 – Shady Grove Yard Inspection – Download PDF
  • 2021-09-17 – West Falls Church Yard Inspection – Download PDF
  • 2021-09-24 – White Flint Station Inspection – Download PDF
  • 2021-09-27 – Cheverly Elevator-Escalator Inspection – Download PDF
  • 2021-09-27 – Federal Triangle Station Inspection – Download PDF
  • 2021-09-30 – Alexandria Yard – Download PDF
  • 2021-10-03 – ROCC Observation – Download PDF
  • 2021-10-04 – ATC Training – Download PDF
  • 2021-10-05 – Brentwood Yard Compliance – Download PDF
  • 2021-10-11 – New Carrollton Yard Compliance – Download PDF
  • 2021-10-12 – New Carrollton S&I Shop Inspection – Download PDF
  • 2021-10-17 – Switch Reinspection – Download PDF
  • 2021-10-18 – Brentwood Yard – Download PDF
  • 2021-10-18 – Crystal City Station Inspection – Download PDF
  • 2021-10-21 – Largo Rail Division Facility – Download PDF
  • 2021-10-30 – Rhode Island Ave. Station – Download PDF
  • 2021-11-01 – Greenbelt Station – Download PDF
  • 2021-11-05 – Compliance Checks – Download PDF
  • 2021-11-12 – ROCC Inspection – Download PDF
  • 2021-11-29 – ATC Training – Download PDF
  • 2021-12-16 – ATC Training – Download PDF

2020

2019

  • 2019-10-04 – New Carrollton CTEM Shop Inspection – D99 – Download PDF
  • 2019-10-18- ROCC Inspection – Download PDF
  • 2019-10-30- Relay Tests – B08 – Silver Spring – Download PDF
  • 2019-11-05 – Interlocking – N02 – Tysons Corner – Download PDF
  • 2019-11-05 – Switch Inspection – New Carrollton Yard – D99 – Download PDF
  • 2019-11-16 – Cable Insulation Resistance Test – Shady Grove Yard – A99 – Download PDF
  • 2019-11-19 – ATC Wayside Inspection Virginia Square K03 to Clarendon K02 – Download PDF
  • 2019-11-19 – Track Circuit Shunt Verification Test Inspection – Virginia Square – K03 – Download PDF
  • 2019-11-21 – Alexandria CTEM Shop C99 – Download PDF
  • 2019-11-21 Alexandria S&I Shop C99 – Download PDF
  • 2019-11-21- ATC Cab Level Test Inspection – K&N Junction- K98 – Download PDF
  • 2019-11-21 ATC TCR Inspection – K&N Junction -K98 – Download PDF
  • 2019-11-23- Track Inspection Verification Observation – Wiehe-Reston East- N06 – Download PDF
  • 2019-12-04 – ATC Wayside Inspection Pentagon C07 to Pentagon City C08 – Download PDF
  • 2019-12-04 -Track Circuit Shunt Verification Test Inspection – Pentagon C07 to Pentagon City C08 – Download PDF
  • 2019-12-11 – Switch Observation Test-Eastern Market -D06 – Download PDF
  • 2019-12-12 – Crossing Inspection – Greenbelt Yard -E99 – Download PDF
  • 2019-12-13 – Switch REINSPECTION – New Carrollton Yard – D99 – Download PDF
  • 2019-12-17 – Track Circuit Shunt Verification Inspection – Naylor Road – F09 – Download PDF
  • 2019-12-17 – Wayside Insp – Naylor Road – F09 – Download PDF
  • 2019-12-18 – ATC Roadway Worker Inspection – Naylor Road F09 to Suitland F10 – Download PDF

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ACCESSIBILITY             DBE               NON-DISCRIMINATION